Customization: | Available |
---|---|
After-sales Service: | 10 Years |
Connection Form: | Bolt Connection |
Still deciding? Get samples of US$ 60/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main steel structure |
1.Steel Q345(S355JR) or Q235(S235JR)H shape |
Sub steel structure |
1.Material Q235(S235JR) steel |
Roof |
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
Wall |
Sandwich panel(PU/EPS/fiberglass/rook wool) or Colorful steel tile |
Doors |
Steel rolling shutter or others |
Windows |
Alu. Alloy window,or others |
Edge Cover |
Steel sheet 0.5mm thickness |
Bolts |
M24,M22,M16 embedded bolts,intensive bolts,galvanized ordinary bolts,high-strength bolts, etc |
Others options |
Skylight panel,Roof ventilator,Down pipe,Galvanized,Crane,sanitary Products |
Foundation |
Cement and steel foundation bolts |
We offer One stop service from design, manufacture, deliver to installation and after-service.
Design
our engineer can design as your request! we can provide drawings for you!
Production
QUOTATION!
If you have drawings, welcome to share drawings with us, quoation will be done based your drawings. Our excellent design team will design the steel structure workshop warehouse for you. If you give the following information, we will give you an satisfactory drawing.
1 Location (where will be built? ) which country? which city?
2 Size: Length*width* Eave height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height) _____kn/m2, _____mm, temperature range?
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high? or other?
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8. door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m